The solar standard is coming: what the new solar energy requirements mean for public and business buildings

Photovoltaic system on a municipal swimming pool — solar standard for public buildings
A project delivered by Sonnis Energy – a photovoltaic system on the roof and car-park canopy of the municipal swimming pool in Burgas.

From 2026, rooftop photovoltaic systems are no longer just a good investment: for a growing share of buildings they are becoming a legal obligation. The European “solar standard” is coming into force in Bulgaria step by step and affects public and non-residential buildings first. In this article we explain exactly what the new legal framework requires, which buildings are affected and by when, and what this means in practice for the owners and managers of business and municipal buildings.

What is the solar standard?

The solar standard comes from the recast Directive (EU) 2024/1275 on the energy performance of buildings (known as the EPBD Recast), in force since 28 May 2024. Article 10 of the Directive introduces two fundamentally new obligations:

  • Solar readiness in new construction. All new buildings must be designed to have the optimal solar energy generation potential for their location and to allow cost-effective installation of solar technologies later on.
  • Actual deployment of solar installations. This applies to certain categories of buildings, where it is technically suitable and economically and functionally feasible.

The Directive requires Member States to create the right conditions for meeting these two requirements, taking into account each site and its characteristics. In practice, this means that a solar installation is now the rule, not the exception.

The deadline for transposing the Directive into national law was 29 May 2026. This means the requirements have to be reflected in the Bulgarian legal framework shortly (the Energy Efficiency Act, the Renewable Energy Act and the related regulations). Even if the transposition is delayed, the owners concerned should plan their actions now, so that they can respond quickly and adequately to the coming changes.

Which buildings, and by when?

Article 10 sets a clear timetable for a phased entry into force. For owners of public and business buildings, the most important dates are:

Building categoryDeadline
All new public and non-residential buildings with a useful floor area over 250 m²by 31 December 2026
Existing non-residential buildings over 500 m² undergoing major renovation or work that requires an administrative permit (energy renovation, roof works, installation of a technical building system)by 31 December 2027
Existing public buildings over 2,000 m²by 31 December 2027
Existing public buildings over 750 m²by 31 December 2028
Existing public buildings over 250 m²by 31 December 2030
All new residential buildingsby 31 December 2029
All new roofed car parks physically adjacent to buildingsby 31 December 2029

The deadlines follow the logic that the larger a building is, and if it serves a public function, the earlier the requirements for solar readiness and actual deployment apply. Smaller buildings are gradually covered up to 2030.

What does this mean in practice?

For municipalities and public institutions, the solar standard becomes a planned commitment. A large share of the municipal building stock, including administrative buildings, schools, kindergartens, sports halls and hospitals, falls within the scope of the requirements by 2030. This calls for early mapping of the buildings by floor area, an assessment of their roof potential and investment planning within the budget cycles.

For businesses the key row is the one on existing non-residential buildings over 500 m² undergoing major renovation. If you are planning a roof renewal, an energy renovation or a major upgrade of a production or commercial building, a photovoltaic installation effectively becomes part of the project scope. This is also when it is most cost-effective to include it – while the renovation is under way and access to the roof is already in place.

There is also an administrative simplification built into the framework. Article 16 of the Directive introduces the concept of a “contact point” – a single point that provides information and coordinates the grid connection procedures. In Bulgarian law this requirement is already reflected through the municipal administrative service centres (Art. 22 of the Renewable Energy Act), which give guidance on the procedures for building renewable energy facilities. The aim is to make permitting and grid connection more predictable.

The context in Bulgaria

In recent years Bulgaria has gone through a real solar boom — the country’s photovoltaic capacity doubled within two years. Rooftop installations for businesses have become one of the fastest-paying energy investments, given the high electricity prices for non-household consumers.

The new regulation essentially formalises and speeds up a trend the market is already following voluntarily. The difference is that a photovoltaic system turns from an “optional” choice into a condition for commissioning new buildings and for carrying out renovations of large existing buildings.

Financing: the instruments exist, but the windows open and close

The shift to mandatory installations is also supported financially. In recent periods, European grant schemes for building photovoltaic systems were open to small and medium-sized enterprises (SMEs), for example the procedure supporting photovoltaic systems and facilities in SMEs under the “Development of the Regions” Programme 2021–2027, with an aid intensity of up to 65%. Applications under this particular procedure closed at the end of March 2026, but experience shows that similar windows open periodically during the programming period.

Our advice is therefore: don’t wait for an “obligation” and an “open call” to coincide. Prepare your project technically in advance, so that you can apply as soon as a suitable scheme opens. You can follow the current opportunities through ISUN and the official portal eufunds.bg, and we can help you assess which sites fall within the scope of the support.

How to prepare in time

The most expensive mistake is waiting until the last moment — as the deadline approaches, the workload on designers, suppliers and grid operators will be heavy. The practical steps we recommend taking now:

  1. Identify the buildings affected by use and useful floor area, and rank them by the applicable deadline.
  2. Assess the roof potential — load-bearing capacity, orientation, shading, available space and grid connection point.
  3. Prepare a technical and economic analysis of 2–3 options (with and without a battery, different capacities) to see the real return and payback period for the specific site.
  4. Align with upcoming renovations — if you are planning roof work or an energy renovation, include the photovoltaic installation in the project from the start.
  5. Follow the funding programmes and prepare the documentation in advance.

How we can help

In short – with all of the points above. At Sonnis Energy we deliver turnkey photovoltaic systems — from the initial analysis and design, through the entire administrative procedure (connection to the distribution grid, building permits), to construction, commissioning and ongoing maintenance. For each site we prepare a comparative analysis with the real energy and financial results, so that your decision rests on clear figures — investment, savings, payback period and return.

If you manage a public or business building that falls within the scope of the new requirements, contact us for a free initial consultation. The sooner we start, the more room there is for an optimal and smooth delivery — before the deadline arrives.


The information in this article is of a general nature and is based on Directive (EU) 2024/1275 and publicly available sources as of June 2026. The specific national requirements, thresholds and funding deadlines are subject to confirmation in current Bulgarian legislation and in the terms of the respective programmes. For an assessment of a specific site, please contact our team.